Mount Fuji

Fuji · Japan's highest peak 3,776m · Standard 2-day Yoshida course

Mount Fuji glowing pink under a dawn sky
Mount Fuji Playbook

Mount Fuji Hiking Playbook

A guide to Japan's highest peak at 3,776m. Reflecting the 2025 fee hike (4,000 yen on all trails) and the Yoshida reservation system, with detailed routes from the 2-day Yoshida climb to the Gotemba long haul.

Photo by Wren Chai / Unsplash
Beginner
Yoshida Trail 2-Day Course
Fuji-Subaru Line 5th Station → overnight at an 8th-station hut → dawn summit → back down · about 13.6 km round trip · ascent 5–7 h
Round trip ~13.6 km
Ascent time 5–7 h
5th Station ~2,300 m
Difficulty
Season Jul 1–Sep 10
Permit 4,000 yen

Course Flow

Fuji-Subaru Line 5th St. (~2,300 m)→Overnight at 8th-station hut (~3,400 m)→Kengamine 3,776 m→Descend to trailhead

Elevation Profile

Kengamine 3,776 m

The most recommended standard course. Since 2025 the Yoshida Trail requires an online reservation with prepayment of the 4,000-yen toll on the official site, caps climbers at 4,000 per day, and closes its gate from 2 p.m. to 3 a.m. (hut guests excepted). The standard plan enters in the afternoon, sleeps at an 8th-station hut, and summits before dawn.

Route by Section

Start
Fuji-Subaru Line 5th Station
0 km ~2,300 m
⌄

Start from the 5th station on the Fuji Subaru Line. Clear the gate after confirming your reservation and toll. Entry after 2 p.m. is in principle restricted.

The direct bus from Shinjuku (about 2 h 25 m) books out early in peak season — reserve ahead.
1
5th → 8th station
~4.5 km 5–7 h
⌄

Climb past Satogomeya (6th) and Taishikan (7th) to the 8th-station hut cluster — the best-equipped trail for huts and shops.

Check the gate closure (2 p.m.–3 a.m.) carefully when planning an afternoon entry.
2
Hut night → dawn summit
~2.3 km 1.5–2.5 h
⌄

Set out at 2–3 a.m. with a headlamp and follow the crater rim to Kengamine (3,776 m) for sunrise, then visit Okumiya Shrine.

Even in summer the summit is cold and windy — windproof, insulated layers are essential.
Descent
Summit → 5th station
~6.8 km 3–4 h
⌄

Follow the Yoshida descent path back to the 5th station; the gravelly sections are slippery — take them slowly.

Watch for the point where the ascent and descent trails split.

Gear

  • Windproof & insulated clothing
  • Headlamp (spare batteries)
  • 2 L water + high-calorie snacks
  • Cash for the huts

Reservations

  • Yoshida toll reservation (official site)
  • Hut booking required
  • 4,000-yen toll prepaid

Cautions

  • Gate closed 2 p.m.–3 a.m.
  • Sudden alpine weather / hypothermia
  • Peak-season crowds

Concept Map

Fuji-Subaru Line 5th St.Kengamine 3,776 mStandard 2-day sunrise course

Checkpoints

1
Fuji-Subaru Line 5th St. Starting Point
~2,300 m 0 km
Amenities: Bus terminal · shops · restrooms
2
6th St. Satogomeya Rest
~2,390 m ~1.0 km
Amenities: Hut · water
3
7th St. Taishikan Rest
~2,720 m ~2.4 km
Amenities: Hut · shop
4
8th St. Taikansha Hut cluster
~3,020 m ~3.6 km
Amenities: Huts · first-aid
5
Kengamine (summit) Summit
3,776 m ~6.8 km
Amenities: Okumiya Shrine
Intermediate
Fujinomiya Trail Day Hike
Fujinomiya New 5th Station → summit round trip · about 8.6 km · ascent 4–5.5 h
Round trip ~8.6 km
Ascent time 4–5.5 h
New 5th St. ~2,400 m
Difficulty
Season Jul 10–Sep 10
Permit 4,000 yen

Course Flow

Fujinomiya New 5th St. (~2,400 m)→Summit 3,776 m→Back down

Elevation Profile

Summit 3,776 m

The shortest and fastest route, starting higher (about 2,400 m) than any other. The trade-off is a steep, exposed path, so a same-day round trip suits hikers with fitness and acclimatization. The Shizuoka-side trails run July 10 – September 10; the toll is collected on the trail.

Route by Section

Start
Fujinomiya New 5th Station
0 km ~2,400 m
⌄

Start early from the Shizuoka-side trailhead and plan to descend before afternoon weather deteriorates.

Allow 8–9 hours for the full round trip, and check your return bus first.
1
5th → 8th station
~3.0 km 2.5–3.5 h
⌄

An easy start turns steep from mid-route. Volcanic gravel makes sturdy footwear important.

The slope is steep and exposed — in rain or fog, descend rather than push on.
2
8th → summit
~1.3 km 1.5–2 h
⌄

Follow the ridge to the summit; you can drop into the crater to Okumiya Shrine and climb back out.

The crater detour adds time — budget it with your descent schedule.
Descent
Summit → New 5th Station
~4.3 km 2–3 h
⌄

Descend the same trail; hard on the knees — poles help.

Afternoon thunderstorms are common. Summit before noon, descend early.

Gear

  • Windproof & insulated clothing
  • Headlamp
  • 2 L+ water
  • Trekking poles

Fees

  • 4,000-yen toll (paid on trail)
  • Separate hut booking if overnight
  • Check day-trip requirements

Cautions

  • Steep, exposed sections
  • Afternoon storms
  • Altitude symptoms

Concept Map

Fujinomiya New 5th St.Summit 3,776 mShortest trail with the highest start

Checkpoints

1
Fujinomiya New 5th St. Starting Point
~2,400 m 0 km
Amenities: Bus · parking · shops
2
6th Station Rest
~2,590 m ~1.1 km
Amenities: Hut
3
7th Station Rest
~2,780 m ~1.9 km
Amenities: Hut · water
4
8th Station Hut cluster
~3,100 m ~2.8 km
Amenities: Huts
5
Okumiya Shrine · Summit Summit
3,776 m ~4.3 km
Amenities: Shrine
Advanced
Gotemba Trail 2-Day Course
Gotemba New 5th Station → summit → back · ascent ~10.5 km · official time ~8 h 40 m
Round trip ~18.9 km
Ascent time ~8 h 40 m
New 5th St. ~1,440 m
Difficulty
Season Jul 10–Sep 10
Permit 4,000 yen

Course Flow

Gotemba New 5th St. (~1,440 m)→Ridge above 8th station→Summit 3,776 m→Descend to trailhead

Elevation Profile

Summit 3,776 m

The longest route with the largest elevation gain (~2,300 m): an ascent of about 10.5 km in an officially estimated 8 h 40 m, and a descent of about 8.4 km in about 3 h 30 m. It is a long grind across wide volcanic erosion-control terrain — not recommended for beginners, and normally split over two days.

Route by Section

Start
Gotemba New 5th Station
0 km ~1,440 m
⌄

Start from the southeast-side trailhead; the low starting elevation means preparing for heat and distance.

Carry ample water and snacks and keep a low pace — this route rewards patience.
1
5th → 7th station
~4.8 km 3–4 h
⌄

Long, straight stretches across the erosion-control terrain; note where the trail splits from Subashiri.

Distance is deceptive here — budget time conservatively.
2
7th → above 8th station
~3.2 km 3–4 h
⌄

Switchbacks begin and the grade steepens sharply; above the 8th station the trail merges toward the Yoshida–Subashiri ridges.

If altitude symptoms appear, stop ascending immediately.
Descent
Summit → trailhead
~8.4 km ~3 h 30 m
⌄

Descend the Gotemba descent path — its length makes knee braces practically mandatory.

On a 2-day plan, the standard rhythm is a night at an 8th-station hut, a dawn summit, and a morning descent.

Gear

  • Windproof & insulated clothing
  • Headlamp
  • 2.5 L+ water + snacks
  • Knee braces & poles

Fees

  • 4,000-yen toll (paid on trail)
  • Separate hut booking if overnight
  • Check the last descent bus

Cautions

  • Longest route, biggest gain
  • Plan an exit if exhausted
  • Afternoon weather deterioration

Concept Map

Gotemba New 5th St.Summit 3,776 mLongest route, biggest endurance test

Checkpoints

1
Gotemba New 5th St. Starting Point
~1,440 m 0 km
Amenities: Parking · shops · restrooms
2
6th Station Rest
~1,720 m ~2.4 km
Amenities: Hut
3
7th Station Rest
~2,430 m ~4.8 km
Amenities: Hut · water
4
8th Station Hut cluster
~2,890 m ~7.3 km
Amenities: Huts
5
Summit (Kengamine) Summit
3,776 m ~10.5 km
Amenities: Okumiya Shrine